Mechanical and civil/structural design for a new greenfield trap rock quarry operation consisting of over 50 belt conveyors, 5 crushers, 10 screens, several cast in place concrete tunnels with reclaim, mine haul truck dump, and high speed dual rail loadout.
You also might be interested in
Mechanical and structural design for replacing existing single single outlet[...]
2200 TPH conveyor transfer chute with difficult transition Existing layout[...]
System designed to pump lime slurry to several kilns for[...]
St. Louis Location
- 400 Lemay Ferry Rd., Suite 103, St Louis MO, 63125
- Office: (314) 833-5610
- Jeffrey Obermeyer
- [email protected]
- Andrew Jansen
- [email protected]
Birmingham Location
- 160 Yeager Parkway, Suite 105 Pelham, AL 35124
- Office: (205) 624-2196
- Roger Rossics
- [email protected]
Tampa Location
- 652 East Bloomingdale Ave., Brandon, FL 33511
- Office: (813) 657-9777
- Christopher Macias
- [email protected]