Mechanical and civil/structural design for a new hydrated lime facility consisting of an existing relocated hydrator, new high efficiency separator, new grinding circuit, and new additional storage with hydrator outage time less than 30 days
You also might be interested in
2200 TPH conveyor transfer chute with difficult transition Existing layout[...]
Mechanical and structural design for replacing existing single single outlet[...]
Mechanical and civil/structural design for a new greenfield trap rock[...]
St. Louis Location
- 400 Lemay Ferry Rd., Suite 103, St Louis MO, 63125
- Office: (314) 833-5610
- Jeffrey Obermeyer
- [email protected]
- Andrew Jansen
- [email protected]
Birmingham Location
- 160 Yeager Parkway, Suite 105 Pelham, AL 35124
- Office: (205) 624-2196
- Roger Rossics
- [email protected]
Tampa Location
- 652 East Bloomingdale Ave., Brandon, FL 33511
- Office: (813) 657-9777
- Christopher Macias
- [email protected]