- 2200 TPH conveyor transfer chute with difficult transition
- Existing layout was 3D laser scanned in order to ensure proper fit-up with new chutework
- Discrete element modeling (DEM) performed in order to ensure proper material flow pattern, velocities, & wear
- Fabrication detail drawings developed for chutework and liners
You also might be interested in
Mechanical and civil/structural design New 250 ton bolted steel storage[...]
Mechanical and civil/structural design for a new greenfield trap rock[...]
Mechanical and civil/structural design for a new hydrated lime facility[...]
St. Louis Location
- 400 Lemay Ferry Rd., Suite 103, St Louis MO, 63125
- Office: (314) 833-5610
- Jeffrey Obermeyer
- [email protected]
- Andrew Jansen
- [email protected]
Alabama Location
- 160 Yeager Parkway, Suite 105 Pelham, AL 35124
- Office: (205) 624-2196
- Roger Rossics
- [email protected]